Oct 25, 2021 Leave a message

Pharmaceutical lyophilizer installation and lyophilization preparation:

1. The vacuum pump and the main engine are connected by a vacuum pressure pipe. Standard quick clamps are used at both ends. The clamps are equipped with a rubber sealing ring. Before connection, apply an appropriate amount of vacuum grease on the sealing ring, and then clamp the clamps at both ends.

2. A "main power" socket is installed above the right board of the host. One end of the power cord is inserted and the other end is connected with the electric power supply. A vacuum pump power socket is installed on the "main power" side, and the vacuum pump power cord can be plugged in.

3. Please read the "operation manual" of the vacuum pump in detail, check the vacuum pump, confirm that the vacuum pump oil has been filled, do not run without oil, and the oil level shall not be lower than the center line of the oil mirror.

4. The "○" seal ring above the cold well shall be kept clean, and a layer of vacuum grease can be applied evenly before use.

5. Put the materials into the material tray, put the material tray on the pre freezing rack, put the pre freezing rack into the cold well, cover the thermal insulation cover, and pre freeze for ~ hours.

6. If the gland configuration is selected, inject the material into the Xilin bottle, then put the Xilin bottle into the cold trap and pre freeze for ~ hours. After pre freezing, put the Xilin bottle into the material tray of the gland for drying.

7. If the multi manifold configuration is selected, inject the materials into the selected drying bottle, then put the drying bottle into the cold well, cover the thermal insulation cover and pre freeze for ~ hours. If possible, pre freeze the drying bottle while rotating, so as to freeze the materials evenly on the bottle wall, which is conducive to accelerating drying.

8. Press and hold the "main power" button on the control panel for three seconds to power on the control system. At this time, the temperature window displays the current cold trap coil temperature. Please check the possible leakage points, valves and relevant sealing rings one by one with the exclusion method.